
Road Line Marking
From subdivision handovers to council maintenance programs, we've marked thousands of kilometres of roads across Australia. Every job follows AS 1742 to the letter, uses retroreflective materials that perform at night, and is completed with full traffic management. VicRoads approved. Transport NSW certified.
Jamie (24/7 quotes): 0468 069 002AS 1742.2 Compliant
Fully Insured
24/7 Availability
15+ Years
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ businesses
VicRoads approved · AS/NZS compliant · $20M insured
Compliance-Ready Guarantee: every job is marked to AS 1742 and the state road authority specification, dimensionally verified and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.
Last updated:
Road Marking That Stands Up to Australian Conditions
Quick answer: Line Marking Australia marks public and private roads for councils, developers and civil contractors across Australia. We mark centre lines, edge lines, lane lines and intersections to AS 1742.2:2022, in paint or thermoplastic, and usually work at night with full traffic management. We are VicRoads and Transport for NSW approved and quote within 48 hours.
A civil contractor in Pakenham called us last year mid-project. Their previous line marking subcontractor had pulled off the job, leaving a subdivision half-finished with council handover deadline in two weeks. They needed 4.2 kilometres of centre lines, edge lines, and intersection markings completed before the clock ran out.
We mobilised within 48 hours. Our crews worked six consecutive nights with full traffic management. Every marking met AS 1742 specifications. The subdivision passed council inspection first time. That's the kind of turnaround we're set up for.
We made costly mistakes early on. In 2013, we quoted a job in Ballarat without accounting for the steeper terrain. Crews took twice as long as estimated on the hill sections. That project taught us to always do proper site assessments, especially for regional work. We haven't underquoted a road job since.
Road marking standards and specifications
Line widths, colours and patterns come from AS 1742.2:2022. Paint and thermoplastic meet the AS 4049 series, and glass beads for night visibility meet AS/NZS 2009. State road jobs also follow the local spec, such as VicRoads Section 721, MRWA Specification 604 in WA or TMR MRTS45 in Queensland. Find out more about thermoplastic line marking, traffic management works and temporary line marking for staged road works.
Railway and level-crossing line marking
Line Marking Australia's Victorian crew holds rail industry worker (RIW) registration with Metro and V/Line accreditation, and marks level crossings, station platforms and rail maintenance facilities, including yellow box markings and platform tactiles. Rail corridor work is planned around access windows and the network operator's safety rules.

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
Centre Line & Lane Marking Specifications
AS 1742.2:2022, Manual of uniform traffic control devices Part 2: Traffic control devices for general use. Specifies line widths (100mm standard, 150mm barrier), colours, patterns, and dimensions for centre lines, edge lines, and lane lines.
Pavement Marking Material Standards
AS 4049 series, Paints and related materials: pavement marking materials. Part 1 covers solvent-borne paint, Part 2 thermoplastic, Part 3 waterborne paint and Part 4 high-performance systems. Performance requirements for durability and colour.
Night-Time Visibility & Retroreflectivity
AS/NZS 2009, Glass beads for pavement-marking materials. Sets the glass bead types that make road markings visible at night.
Traffic Management During Road Works
Austroads AGTTM, Australian Guide to Traffic Management. Comprehensive guidance on traffic management during road works. We follow AGTTM requirements for all road marking projects to ensure worker and public safety.
Pedestrian Crossing & School Zone Marking
AS 1742.10:2024, Manual of uniform traffic control devices Part 10: Pedestrian control and protection. Specific requirements for marked foot crossings, children's crossings, and school zone pavement markings.
Intersection & Roundabout Marking
AS 1742.14:2014, Manual of uniform traffic control devices Part 14: Traffic signals. Includes pavement marking requirements for signalised intersections and approach markings to roundabouts.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS 4049
Pavement Marking Paint
Sets the performance of road marking paints, including waterborne paint used on most public roads.
AS/NZS 2009
Glass Beads
Covers the retroreflective glass beads that make road lines visible at night and in the wet.
State specs
Road Authority Rules
Public road work follows the state specification, such as VicRoads Section 721, TMR MRTS45 or MRWA Specification 604.
What Our Clients Say
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
Thermoplastic is a hot-applied material that's thicker (2-3mm vs 0.3mm for paint) and far more durable. It lasts 4-6 years on high-traffic roads versus 1-2 years for paint. Paint is more economical for low-traffic residential streets. Most councils specify thermoplastic for arterial roads.
AS 1742.2 specifies 100mm width for standard broken centre lines and 150mm for barrier lines. Edge lines are typically 100mm. Lane lines vary between 80mm and 100mm depending on road classification.
We handle everything. Our crews include traffic control certified personnel and we provide all signage, cones, and barriers. Traffic management plans are prepared and submitted to relevant authorities as part of our service.
Thermoplastic sets within minutes as it cools, and traffic can usually return within 10 to 20 minutes. Waterborne paint needs 20-30 minutes in good conditions. We manage traffic around freshly marked areas until surfaces are safe.
Yes, we mark private roads in industrial estates, body corporate complexes, and commercial properties to the same standards as public roads. This is important if your private road connects to public roads or if council has conditions on your development.
We provide completion certificates, compliance documentation referencing AS 1742, material specifications, retroreflectivity test results if required, and photos. Everything councils need for Statement of Compliance sign-off.
Expert Guides
In-depth compliance guides and resources related to road line marking.
How Much Does Road Line Marking Cost?
Explore the factors affecting road line marking cost in Australia. Understand materials, traffic management, and guidelines to make informed decisions.
Read guideLine Marking Cost Per Metre in Australia
Discover the factors affecting line marking costs per metre in Australia. From project size to paint types, learn what's involved.
Read guideRoad Line Marking Standards Australia: AS 1742 Complete Guide
Complete guide to Australian road line marking standards — AS 1742, Austroads AGTM, state authority requirements and material specifications for councils and contractors.
Read guideRecent Projects
Real road line marking projects completed by our team.

Shared Path Line Marking: 2.4 km in Catherine Fields NSW
Catherine Fields, NSW · About 2.4 km of line
View case study
Industrial Car Park and Entry Marking: Acacia Ridge QLD
Acacia Ridge, QLD · 2 sites
View case study
Council Road Marking: 15km Residential Streets Ballarat VIC
Ballarat, VIC · 15 kilometres
View case studyIndustries We Serve
We provide road line marking across these industry sectors.
Related Services

Council Line Marking Melbourne
Learn more about this service

Pedestrian Crossings Line Marking
Learn more about this service

Road Line Marking Adelaide
Learn more about this service

Speed Stencils & RRPMs
Learn more about this service

Thermoplastic Marking That Lasts 4-6 Years Under Heavy Traffic
Learn more about this service

Traffic Management for Works
Learn more about this service
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call us directly: 0417 460 236