
Traffic Management for Works
Line marking on active roads requires proper traffic management. AGTTM and AS 1742.3 set the standards for work zones. We implement compliant traffic control for our crews and your road users.
Jamie (24/7 quotes): 0468 069 002AS 1742.2 Compliant
Fully Insured
24/7 Availability
15+ Years
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ businesses
VicRoads approved · AS/NZS compliant · $20M insured
Compliance-Ready Guarantee: every job is marked to AS 1742 and the state road authority specification, dimensionally verified and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.
Last updated:
Safe Work Zones for Road Marking
Quick answer: Line Marking Australia sets up traffic management for every line marking job on roads and in car parks. Work zones follow AS 1742.3:2019 and the Austroads Guide to Temporary Traffic Management (AGTTM), with certified traffic controllers and plans prepared by qualified designers, so our crew and road users stay safe while the work is done.
Marking roads while traffic flows isn't something you improvise. One mistake and someone gets hurt, either our crew or a road user.
AGTTM (Austroads Guide to Temporary Traffic Management) and AS 1742.3 specify exactly how work zones must be set up. Sign placement, taper lengths, buffer zones, lane widths, speed reductions, all calculated based on the road and traffic conditions.
Our traffic controllers hold current certifications. Our traffic management plans are prepared by qualified designers. We don't take shortcuts because the consequences are too serious.
A few years back, a competitor was marking a shopping centre carpark entry without proper traffic control. A car drove through their work zone and hit a worker. Broken leg, months off work, legal action. All because they tried to save time on traffic management.
We set up proper control even when clients say 'it's only a quiet carpark'. Quiet carparks have unexpected vehicles. Roads have distracted drivers. Protection isn't optional.
Traffic management is part of our road line marking, temporary line marking and car park line marking work, and road quotes include it as standard.

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
AGTTM
Austroads Guide to Temporary Traffic Management providing comprehensive guidance for work zones.
AS 1742.3
Traffic control devices for works on roads specifying signs, devices, and placement.
State Road Authority Requirements
VicRoads (now the Department of Transport and Planning), TfNSW, MRWA, TMR, DIT (SA), and other state authorities have specific requirements.
Safe Work Australia
Workplace health and safety requirements for workers in traffic environments.
AS/NZS 4602.1
High visibility safety garments for workers in road environments.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS 4049
Pavement Marking Paint
Sets the performance of road marking paints, including waterborne paint used on most public roads.
AS/NZS 2009
Glass Beads
Covers the retroreflective glass beads that make road lines visible at night and in the wet.
State specs
Road Authority Rules
Public road work follows the state specification, such as VicRoads Section 721, TMR MRTS45 or MRWA Specification 604.
What Our Clients Say
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
Yes, we provide complete traffic management for road and carpark marking. This includes certified controllers, signs, devices, and traffic management plans where required.
Our controllers hold current state accreditation (e.g., Traffic Controller Certificate in Victoria). Qualifications are maintained and verified.
Yes, we prepare traffic management plans for road authority approval where required. Plans are prepared by qualified traffic management designers.
Yes, with appropriate traffic management. This may involve lane closures, speed reductions, or night works depending on road conditions and authority requirements.
Yes, when required for the work. We assess each project and include appropriate traffic management in our pricing. No hidden extras.
Even private carparks need traffic control for worker safety. We implement appropriate measures based on traffic conditions, even when road authority requirements don't apply.
Related Services

Line Removal That Actually Eliminates Ghosting
Learn more about this service

Line Marking Toowoomba Regional Council
Learn more about this service

Pedestrian Crossings Line Marking
Learn more about this service

Road Line Marking
Learn more about this service

Speed Stencils & RRPMs
Learn more about this service

Thermoplastic Marking That Lasts 4-6 Years Under Heavy Traffic
Learn more about this service
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call us directly: 0417 460 236