Line marking service hero background

Traffic Management for Works

Line marking on active roads requires proper traffic management. AGTTM and AS 1742.3 set the standards for work zones. We implement compliant traffic control for our crews and your road users.

AS 1742.2 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

How Safe Work Zones for Road Marking?

Marking roads while traffic flows isn't something you improvise. One mistake and someone gets hurt, either our crew or a road user.

AGTTM (Austroads Guide to Temporary Traffic Management) and AS 1742.3 specify exactly how work zones must be set up. Sign placement, taper lengths, buffer zones, lane widths, speed reductions, all calculated based on the road and traffic conditions.

Our traffic controllers hold current certifications. Our traffic management plans are prepared by qualified designers. We don't take shortcuts because the consequences are too serious.

A few years back, a competitor was marking a shopping centre carpark entry without proper traffic control. A car drove through their work zone and hit a worker. Broken leg, months off work, legal action. All because they tried to save time on traffic management.

We set up proper control even when clients say 'it's only a quiet carpark'. Quiet carparks have unexpected vehicles. Roads have distracted drivers. Protection isn't optional.

Key Benefits

Certified traffic controllers holding current state accreditation

Traffic management plans prepared by qualified designers for road authority approval

AGTTM compliant work zones with correct sign placement, tapers, and buffer zones

AS 1742.3 compliant signage and delineation devices

Night works capability with appropriate lighting and high-visibility setup

Coordination with road authorities for permit requirements and approvals

Safe Work Zones for Road Marking
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

AGTTM

Austroads Guide to Temporary Traffic Management providing comprehensive guidance for work zones.

AS 1742.3

Traffic control devices for works on roads specifying signs, devices, and placement.

State Road Authority Requirements

VicRoads, TfNSW, MRWA, TMR, DPTI, and other state authorities have specific requirements.

Safe Work Australia

Workplace health and safety requirements for workers in traffic environments.

AS/NZS 4602.1

High visibility safety garments for workers in road environments.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

What Our Clients Say

4.9/5 from 500+ reviews

650-bay shopping centre carpark remarked over two weekend nights. Centre stayed open, customers didn't notice. Parking complaints dropped 80% in first month according to security logs. Best investment this year.

Laverton North, VIC

Shopping Centre Manager

Full warehouse floor marking before safety audit. Assessed Thursday, quoted Friday, completed Sunday night. 2,400 linear metres in one eight-hour shift. Audit passed with zero recommendations. That's the turnaround you need.

Campbellfield, VIC

Logistics Operations Manager

Entire playground remarked during Easter holidays. Basketball courts, netball courts, handball squares, running track. Kids came back to completely fresh markings. Five days, zero disruption to term. Exactly what we needed.

Keysborough, VIC

School Business Manager

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0468 069 002

Frequently Asked Questions

Yes, we provide complete traffic management for road and carpark marking. This includes certified controllers, signs, devices, and traffic management plans where required.

Our controllers hold current state accreditation (e.g., Traffic Controller Certificate in Victoria). Qualifications are maintained and verified.

Yes, we prepare traffic management plans for road authority approval where required. Plans are prepared by qualified traffic management designers.

Yes, with appropriate traffic management. This may involve lane closures, speed reductions, or night works depending on road conditions and authority requirements.

Yes, when required for the work. We assess each project and include appropriate traffic management in our pricing. No hidden extras.

Even private carparks need traffic control for worker safety. We implement appropriate measures based on traffic conditions, even when road authority requirements don't apply.

Related Services

Site Assessment & Quote

Site Assessment & Quote

Free site assessments and accurate fixed-price quotes within 48 hours. Upload plans for professional line marking quotes across Australia.

View details
Accessible Parking Compliance

Accessible Parking Compliance

AS/NZS 2890.6 compliant accessible parking marking. Avoid $4,800+ council fines. Correct dimensions, shared spaces, and symbol placement Australia-wide.

View details
Drying & Curing

Drying & Curing

Understanding line marking drying and curing times. When traffic can return to freshly marked surfaces. Protect your investment.

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002