Case Studies
View our completed line marking projects across Australia. Carparks, warehouses, roads, schools, and sports facilities. See real results from real projects.
Line Marking Case Studies: Real Projects, Real Outcomes
Anybody can claim they do good work. We'd rather show you. These are real projects from across Australia, documented with actual dimensions, timelines, outcomes, and where relevant, the problems we had to solve.
Some of these jobs were straightforward. Turn up, prepare, mark, document. Done. Others were more complicated — tight operational windows, surfaces with pre-existing problems, compliance requirements that the previous contractor had got wrong, or urgent timelines that required mobilising faster than usual.
In each case, the outcome is documented honestly. That includes the ones where we had to do more than originally quoted because the surface wasn't what we expected. We don't hide those.
What These Case Studies Cover
- Commercial car parks with before-and-after dimensions and compliance outcomes
- Warehouse and factory floor projects with material specifications and WorkSafe outcomes
- Road marking projects for councils with VicRoads and Transport NSW acceptance results
- Sports courts and school playgrounds with dimension verification
- Airport and specialist projects with CASA compliance documentation
Each case study references the applicable AS/NZS standard and the documentation provided to the client on completion. Seen a case study relevant to your project? Upload your plans for a fixed-price quote within 48 hours.
Council Road Marking: 15km Residential Streets Ballarat VIC
Annual maintenance program for a regional Victorian council. 15km of residential streets, 23 pedestrian crossings, and 8 school zones completed during school holidays.
Hospital Carpark Compliance Upgrade: 18 Accessible Bays in Dandenong
A private hospital faced $86,400 in potential fines for non-compliant accessible bays. We reconfigured all 18 bays to AS/NZS 2890.6 requirements over three nights.
School Playground and Carpark Line Marking: Complete Campus Refresh in Keysborough
A primary school needed playground games and carpark markings refreshed before Term 1. 45 bays, basketball court, four-square, and hopscotch completed over Christmas holidays.
Shopping Centre Carpark Line Marking: 650 Bays in Laverton North
A shopping centre faced non-compliant accessible bays and faded markings. We completed 650 bays over two weekends with zero trading hours lost.
Sports Club Multi-Court Line Marking Moorabbin | Tennis Netball Basketball
A community sports club needed three courts remarked to competition standards. Tennis failed certification. We learned an expensive lesson and developed a precision process.
Warehouse Floor Marking: 2,400m Safety Lines Campbellfield
Safety audit in four days with invisible forklift lanes. We assessed Saturday, quoted by lunch, and completed 2,400m of safety markings in one overnight shift.