School Playground and Carpark Line Marking: Complete Campus Refresh in Keysborough

The Challenge: Worn Playground, Confusing Carpark, Term 1 Deadline
A primary school in Keysborough contacted us in November with a familiar story. Their playground markings had faded to nothing. Kids couldn't see the four-square lines. The basketball court was barely visible. And the hopscotch? Completely gone.
But the playground wasn't the only problem. The carpark had become a morning chaos zone. Parents were creating their own drop-off spots. Staff parking wasn't clearly marked. The kiss-and-drop zone was ignored because nobody could see where it was.
The school had one requirement: everything had to be ready before Term 1 started in late January. They wanted students to return to a fresh, vibrant campus.
Our Approach: Education Meets Safety, Colour Meets Compliance
We split the project into two phases: carpark first (the safety priority), playground second (the fun part). Both had to be done right.
Carpark Layout
Working with the school administration, we redesigned the carpark layout. 45 standard bays for parents and visitors. 12 designated staff bays (numbered for accountability). 2 accessible bays meeting AS/NZS 2890.6. A clearly marked kiss-and-drop zone with entry and exit arrows. Safety islands for students walking to the school entrance.
Playground Games Selection
The school wanted a mix of active games and educational elements. We provided: one full-size basketball court (meeting modified primary school dimensions), six four-square courts (the most requested game), three hopscotch designs (including an alphabet version for younger students), one number snake (1-100 for maths practice), and one Australian map outline (for geography lessons).
Material Selection
Playground markings take serious punishment from running feet and Australian sun. We used specialised playground paint with UV stabilisers to resist fading. Anti-slip additives went into all games in high-traffic areas. Carpark markings used standard line marking paint with waterborne formulation for environmental compliance.
Colour Scheme
School playgrounds should be vibrant. We used the school's house colours for the four-square courts (red, blue, green, yellow). The basketball court got regulation orange keys. Hopscotch alternated bright colours to make each square visible. The number snake used a rainbow progression from 1-100. Every colour was chosen for maximum visibility and durability.
The Results: Ready for Term 1, Engaged Students, Happy Parents
We finished with four days to spare before Term 1. The principal walked the finished site with us and couldn't stop smiling. Teachers were already planning outdoor lessons using the number snake and alphabet hopscotch.
The carpark transformation was equally successful. Morning drop-off chaos was replaced by orderly flow. Parents used the kiss-and-drop zone correctly because they could see it clearly. Staff had their own section. No more parking arguments.
The school sent us photos a few weeks into term. Kids were queuing for the four-square courts. The basketball court was in constant use. Mission accomplished.
Results Highlights
Case Study FAQs
With proper materials and application, playground markings typically last 3-5 years depending on usage and sun exposure. We use UV-stabilised paints specifically designed for playground applications. High-traffic games like four-square may need touch-ups after 2-3 years. We offer maintenance packages for schools that want to keep markings fresh.
Absolutely. We've painted custom compass roses, world maps, times tables grids, and school mascots. If you can draw it, we can mark it. Custom designs require a template or clear artwork, and we'll provide a quote based on complexity and size.
School carparks require the same compliance as any commercial carpark. All bays meet AS/NZS 2890.1 dimensions. Accessible bays meet AS/NZS 2890.6. We include proper directional markings, pedestrian crossings, and safety islands. Drop-off zones are designed with student safety as the primary concern.
Almost never. School work is scheduled during holidays, pupil-free days, or after-hours. We understand that student safety comes first, and working around children isn't practical. Christmas and Easter holidays are our busiest periods for school projects.
We offer complete packages including carpark marking, playground games, sports courts, and educational elements. Each package is customised to your school's needs and budget. Contact us with your wish list and we'll provide options at different price points.
Related Case Studies
See how we've helped similar businesses with their line marking needs

Council Road Marking: 15km Residential Streets Ballarat VIC

Warehouse Floor Marking: 2,400m Safety Lines Campbellfield

Hospital Carpark Compliance Upgrade: 18 Accessible Bays in Dandenong
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call James directly: 0468 069 002