Line marking service hero background

Electric Vehicle Charging Bay Line Marking

We've marked EV charging bays at shopping centres, office buildings, and council facilities across Australia since electric vehicles became mainstream. Distinctive green markings, universal EV symbols, and proper bay dimensions that make it crystal clear these spaces are for charging vehicles only. No more petrol cars blocking your chargers while EV drivers circle the carpark in frustration.

AS 1742.2 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

What is Your EV Charging Bays Need to Stand Out From Every Other Space??

[object Object]

Key Benefits

Your EV Charging Bays Need to Stand Out From Every Other Space?
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

Off-Street Parking Facility Design

AS/NZS 2890.1:2004, the primary standard for carpark design and marking applies to EV charging bays. Specifies minimum bay dimensions, though EV bays typically exceed minimums to accommodate charging equipment access. We ensure your EV bays meet base requirements while providing extra width for practical charging.

Electric Vehicle Charging Infrastructure

AS/NZS 3000:2018 (Wiring Rules), while primarily an electrical standard, includes requirements for EV charging installations that impact bay marking. Covers clearance zones around charging equipment and cable management areas. Our marking integrates with proper electrical installation requirements.

Traffic Control Pavement Markings

AS 1742.2:2009, covers pavement marking materials and colour specifications. While green for EV bays isn't explicitly defined in older versions, this standard provides the framework for special purpose marking colours. Our green formulation meets durability and visibility requirements specified.

National Construction Code Requirements

Building Code of Australia (NCC 2022), the latest NCC includes provisions for EV charging infrastructure in new buildings and major renovations. Carparks above certain thresholds must include EV-ready spaces. Our marking services support compliance with these emerging requirements.

Road Marking Materials Performance

AS 4049.3:2005, defines performance requirements for pavement marking materials including colour retention and UV stability. Green paints are particularly susceptible to fading, making material quality critical. We use paints specifically formulated to maintain green colour integrity over time.

Accessible Parking for EV Charging

AS/NZS 2890.6:2009, where accessible EV charging bays are required, this standard specifies additional dimensional and marking requirements. Accessible EV bays need 3.2m minimum width plus shared areas, combined with both accessible parking and EV charging symbols.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

What Our Clients Say

4.9/5 from 500+ reviews

650-bay shopping centre carpark remarked over two weekend nights. Centre stayed open, customers didn't notice. Parking complaints dropped 80% in first month according to security logs. Best investment this year.

Laverton North, VIC

Shopping Centre Manager

Full warehouse floor marking before safety audit. Assessed Thursday, quoted Friday, completed Sunday night. 2,400 linear metres in one eight-hour shift. Audit passed with zero recommendations. That's the turnaround you need.

Campbellfield, VIC

Logistics Operations Manager

Entire playground remarked during Easter holidays. Basketball courts, netball courts, handball squares, running track. Kids came back to completely fresh markings. Five days, zero disruption to term. Exactly what we needed.

Keysborough, VIC

School Business Manager

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0468 069 002

Frequently Asked Questions

We use a specific bright green that aligns with emerging international standards for EV charging infrastructure. It's distinctly different from standard safety green or traffic green. This shade is becoming universally recognised for electric vehicle parking. Using a non-standard green reduces instant recognition and defeats the purpose of distinctive marking.

Standard parking bays are 2.4m minimum width. For EV charging bays, we typically recommend 2.6m to 2.8m. The extra width isn't about the vehicles being bigger, it's about the charging process. Drivers need to access charge ports which can be on either side of the vehicle, and charging cables need space without stretching across adjacent bays.

Absolutely. If you're adding charging stations to existing bays, we can overlay the EV-specific marking onto your current layout. We'd assess the condition of your existing white lines first. If they're badly faded, we might recommend refreshing them at the same time. But if your current marking is in good condition, we can add the EV elements without touching the rest.

Not all of them, but best practice is to include at least one accessible EV charging bay if you have multiple chargers. The DDA and Building Code require accessible parking provision, and as EV adoption increases, accessible drivers need charging access too. An accessible EV bay needs wider dimensions (3.2m minimum) and combined symbols.

Not with the right paint. Cheap greens fade badly because the pigments aren't UV stable. We use commercial-grade traffic paint with UV stabilizers specifically formulated for green applications. Expect 4 to 6 years of colour stability in typical outdoor conditions. For maximum longevity, thermoplastic green is available for high-UV locations.

Upload your site plan showing the charging station locations and we'll quote within 48 hours. Typical EV bay marking for 4 to 8 bays takes a single night shift to complete. We coordinate with your electrical contractor if the charger installation is happening simultaneously. For urgent projects, call James on 0468 069 002 to discuss timing.

Related Services

Driveway Line Marking

Driveway Line Marking

Learn more about this service

View details
Playground Line Marking Services  for Schools

Playground Line Marking Services for Schools

Learn more about this service

View details
Thermoplastic Marking That Lasts 4-6 Years Under Heavy Traffic

Thermoplastic Marking That Lasts 4-6 Years Under Heavy Traffic

Learn more about this service

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002