
Mining & Resources Line Marking
Workshops • Vehicle Separation • Exclusion Zones • Laydown Yards
Line Marking Australia marks workshops, warehouses, laydown yards and site roads for mines, quarries and processing plants, including remote sites in places like the Bowen Basin and the Pilbara. We work to your site traffic management plan and confirm induction and access needs with you before every job.
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ businesses
VicRoads approved · AS/NZS compliant · $20M insured
Compliance-Ready Guarantee: every job is marked to AS/NZS 2890 & AS 1742, dimensionally verified, and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.
Last updated:
Trusted by Major Australian Operators



Clear Markings for Busy Mine and Quarry Sites
Quick answer: Line Marking Australia marks workshops, warehouses, laydown yards and site roads for mines, quarries and processing plants, including remote sites in the Bowen Basin and the Pilbara. Markings follow your site traffic management plan and state mining safety laws, with safety signs to AS 1319 and road markings to AS 1742.2:2022.
A haul truck driver may not see a person standing next to the front wheel. A light vehicle that turns into the wrong lane is a near miss waiting to happen. Clear markings help keep people and machines apart.
We mark workshops, warehouses, laydown yards and site roads for mines, quarries and processing plants. That includes remote sites in regions like Queensland's Bowen Basin and WA's Pilbara.
What we mark on mine and quarry sites
- Workshop and warehouse floors, with walkways and exclusion zones
- Forklift and vehicle lanes
- Light-vehicle parking, go-lines and hold points
- Laydown yards, with bays and aisles for stored gear
- Arrows and stop bars on site roads
- Safety markings around wash bays, fuel bays and muster points
- Floor marking tape where paint is not practical
Keeping light and heavy vehicles apart
Your site traffic management plan sets the rules. We put them on the ground. That can mean separate lanes, crossing points, give-way lines and parking for light vehicles well clear of heavy-vehicle routes.
Send us the plan or the drawings. We mark what the site has approved. If something on the ground does not match the plan, we raise it with your site contact before we paint.
Workshops and warehouses
Mine workshops are busy. Big machines come in for service, and people walk around them all day. Clear walkways, exclusion zones around service bays and marked storage areas help everyone know where they should be.
We use floor coatings that suit the job, like epoxy for areas that see heavy traffic. We will talk about the right product with you when we quote.
How we work on remote sites
Inductions and access first
Every site is different. Before we book travel, we check what your site needs. That can include inductions, medicals, drug and alcohol testing, site-specific training and vehicle rules. We confirm all of that with you before the job, not on the day.
Working with your team
We work through contractors. On remote jobs that might mean a local crew or a team that travels in. We will tell you who is coming, what equipment they bring and how long they need on site.
Working inside your rules
We follow your permits, isolations and site traffic rules. If an area needs to be closed off while paint dries, we plan that with your supervisor.
Quarries and processing plants
Smaller sites have the same risks, just closer together. Quarries and processing plants need clear lanes for loaders and trucks, safe walkways to the office and amenities, and marked parking. We can mark these in one visit.
Laydown yards
Laydown yards fill up fast and change all the time. Marked bays, aisles and walkways make it easier to find gear and keep vehicle routes clear. We can mark a simple grid with bay labels, so your team knows exactly where each item lives.
How a mine site job runs
- You send the site location, the traffic management plan or drawings, and what you need marked
- We confirm induction, access and permit needs with your site contact
- We send a quote that covers travel, time on site and products
- The crew completes site entry steps, then marks to the plan
- We send photos and notes when the job is done
Why work with us
We have done line marking since 2009, and we work across Australia through vetted local contractors. We will be upfront about what we can do on your site, and we will not book travel until access is sorted.
Get a price for your site
Send us the site location, your traffic management plan or drawings, and what you need marked. We will tell you what induction and access steps we need to sort first. Send us your plans for a quote or call 0417 460 236.
Key Benefits
We work to your site traffic management plan
Light and heavy vehicle separation
Exclusion zones and walkways
We sort inductions and access before we travel
Local contractors for remote regions where possible

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Our Services for Mining & Resources
Specialist line marking services tailored to the compliance requirements and operational needs of mining & resources facilities.

Mine Site Line Marking Problems We Fix
We plan every job around how your site runs, so the work fits your hours, your people and your deadlines.
People near heavy machines
We mark walkways, crossing points and exclusion zones so people and machines stay apart.
Light and heavy vehicles mixing
We mark separate lanes, give-way lines and light-vehicle parking to match your traffic management plan.
Remote locations
We work through contractors and plan the travel, gear and time on site with you before the job.
Inductions and site access
We confirm inductions, medicals and access rules for your site before we book anyone to travel.
Hard-wearing workshop floors
We talk about the right floor product for heavy traffic, like epoxy, when we quote.
Standards & Compliance
Site traffic management plan
Each site has its own plan for how vehicles and people move. We mark to the plan your site has approved.
State mining safety laws
Mines run under state laws, like the Coal Mining Safety and Health Act 1999 in Queensland and the WHS (Mines) Regulations 2022 in WA. We follow your site's rules under them.
AS 1319
The Australian standard for safety signs in the workplace. We use it as a guide when markings sit alongside safety signs.
AS 1742
The manual of uniform traffic control devices. We follow its shapes for arrows, holding lines and pavement words on site roads.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS/NZS 2890
Parking Facilities
Covers bay dimensions (2.4m × 5.4m standard, 2.4m × 5.4m accessible plus a 2.4m shared zone), aisle widths, and traffic flow requirements for compliant parking areas.
AS 4586
Slip Resistance
Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.
AS/NZS 1428
Access & Mobility
Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.
5000+
Project Completed
15+
Years Experience
24/7
Emergency Service
100%
Quality Guaranteed
Comprehensive Line Marking
Services
From car parks to warehouses, we deliver precision marking that keeps your workspace safe and compliant

Carpark Line Marking
AS/NZS 2890 compliant bays, accessible bays with proper shared zones. Most projects done over weekends so you stay open.

Road & Traffic Line Marking
Centre lines, crossings, stop bars. AS 1742 compliant. VicRoads approved. Thermoplastic lasts 5-8 years, not 18 months.

Line Marking Removal
Complete removal using grinding or 3500 PSI water blasting. No ghost lines bleeding through your new layout.

Warehouse & Factory Marking
Forklift lanes, pedestrian walkways, hazard zones. Two-pack epoxy for high-traffic areas. Scheduled for zero downtime.

Playground & Sports Court Marking
Courts, games, hopscotch. 12 standard colours or custom matched to your school. Done during holidays, not term time.

Thermoplastic Markings
When paint needs replacing every 18 months, thermoplastic keeps performing for years.
Ready to Get Your Free Quote?
Upload your site plans and receive a fixed-price quote within 48 hours. No call-out fees.
Our Recent Projects

Carpark Re-Line & Accessible Bays
15/03/2024

Council Road & Traffic Marking
22/11/2024

Full Surface Line Removal
10/10/2024

Warehouse Safety Upgrade
28/09/2024

School Playground Repainting
15/08/2024

Site Compliance Audit & Corrections
03/07/2024
Questions Mine Sites Ask Us
Yes. Line Marking Australia works on mine sites, quarries and processing plants, including remote regions like the Bowen Basin and the Pilbara. We work through contractors and plan travel, gear and time on site with you before the job.
Every site has its own rules, so we confirm induction, medical, drug and alcohol testing and access needs with you before we book travel. Tell us your requirements at quote time and we will plan around them.
Yes. We mark lanes, crossing points, give-way lines and parking to match the traffic management plan your site has approved. If the ground does not match the plan, we raise it with your site contact before we paint.
We mark walkways, exclusion zones around service bays, storage areas, forklift lanes and parking for light vehicles. We use floor products that suit heavy traffic, and we agree the right one with you when we quote.
Yes. We can mark bays, aisles and walkways in laydown yards so stored gear is easy to find and vehicles have clear routes. Send us a layout or a few photos to get a price.
Send us the site location, your traffic management plan or drawings, and what needs marking. Line Marking Australia will confirm the induction and access steps, then send a quote.
Related Industries

Warehouse & Factory Line Marking
View details
Transport & Logistics Line Marking
View details
Airport & Port Line Marking
View details
Government & Council Line Marking
View detailsReady to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call us directly: 0417 460 236
