Line marking service hero background

Safety & Compliance Check

Every project ends with verification. We check our work against standards, document what we've done, and provide the records you need for audits and compliance.

AS 1742.2 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

Why Compliance Isn't Optional?

Three Dandenong South facilities copped $4,800+ fines last year for non-compliant accessible parking. Not because they didn't have accessible bays, but because the bays didn't meet AS/NZS 2890.6 specifications. Wrong dimensions, missing shared spaces, symbols in wrong positions.The facility managers didn't know the difference until council inspectors arrived.We measure twice, mark once, and document everything to AS/NZS 2890.6. When inspectors visit, you have records showing exactly what was done and how it meets standards.Early in our business, we marked accessible bays in a retail carpark without checking the current AS/NZS 2890.6. We used an outdated symbol template and positioned it at the rear of bays. Council inspection failed, citing incorrect symbol placement and size.We had to remark all accessible bays at our cost, around $1,500. Since then, we've maintained current copies of all relevant standards, and every accessible marking is verified before we leave site.

Key Benefits

All dimensions verified against AS/NZS specifications before leaving site

Completion certificate confirming work completed to quoted scope and standards

Compliance statement detailing which standards were applied for council inspections

Photo documentation showing before and after for records and insurance

Material specifications and technical data sheets for warranty and future matching

Measurement records for accessible bays and critical markings as audit evidence

Compliance Isn't Optional
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

AS/NZS 2890.1

Off-street parking dimensions verified: 2.4m minimum bay width, aisle widths based on angle.

AS/NZS 2890.6

Accessible parking: 2.4m bays + 2.4m shared space, correct symbol placement and size verified.

AS 1318

Safety colour meanings verified: yellow=caution, red=danger, green=safety, blue=mandatory.

AS 1742 Series

Road marking dimensions, arrow designs, and text heights verified against standards.

Safe Work Australia

Workplace traffic management markings verified for pedestrian and vehicle separation.

AS 4586

Slip resistance considered for wet and dry conditions in marked areas.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

What Our Clients Say

4.9/5 from 500+ reviews

650-bay shopping centre carpark remarked over two weekend nights. Centre stayed open, customers didn't notice. Parking complaints dropped 80% in first month according to security logs. Best investment this year.

Laverton North, VIC

Shopping Centre Manager

Full warehouse floor marking before safety audit. Assessed Thursday, quoted Friday, completed Sunday night. 2,400 linear metres in one eight-hour shift. Audit passed with zero recommendations. That's the turnaround you need.

Campbellfield, VIC

Logistics Operations Manager

Entire playground remarked during Easter holidays. Basketball courts, netball courts, handball squares, running track. Kids came back to completely fresh markings. Five days, zero disruption to term. Exactly what we needed.

Keysborough, VIC

School Business Manager

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0468 069 002

Frequently Asked Questions

Yes, every project includes completion documentation. For accessible parking and safety-critical applications, we provide detailed compliance statements.

AS/NZS 2890 for parking, AS 1318 for safety colours, AS 1742 for roads, Safe Work Australia for workplace traffic management, plus relevant state requirements.

Yes, we provide documentation that satisfies council requirements. If there are questions, we can discuss technical details with inspectors.

We check before we leave site. If anything doesn't meet the standards we quoted to, we fix it before project completion. If issues emerge later, we stand behind our work.

Yes, we keep project records including specifications, materials used, and completion documentation. This helps with future maintenance and matching.

Our documentation supports safety audit requirements. We can provide statements of compliance and measurement records for audit evidence.

Related Services

Drying & Curing

Drying & Curing

Understanding line marking drying and curing times. When traffic can return to freshly marked surfaces. Protect your investment.

View details
Site Assessment & Quote

Site Assessment & Quote

Free site assessments and accurate fixed-price quotes within 48 hours. Upload plans for professional line marking quotes across Australia.

View details
Tactile Ground Surface Indicators

Tactile Ground Surface Indicators

Professional tactile ground surface indicator installation. Warning and directional TGSIs to AS/NZS 1428.4.1.

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002