
Netball Court Construction
New netball courts for schools, clubs and councils: base, surface, lines, posts, fencing and lighting, built to the 30.5 m by 15.25 m court.
Jamie (24/7 quotes): 0468 069 002AS 1742.2 Compliant
Fully Insured
24/7 Availability
15+ Years
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ businesses
VicRoads approved · AS/NZS compliant · $20M insured
Compliance-Ready Guarantee: every job is marked to AS/NZS 2890 & AS 1742, dimensionally verified, and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.
Last updated:
What is Netball Court Construction?
Line Marking Australia builds netball courts across Australia for schools, netball clubs, councils and community centres. We manage the full job: earthworks, base, asphalt or concrete, acrylic or tile surface, line marking to the 30.5 m by 15.25 m court, goal posts, fencing and lighting. Every netball court is quoted per site.
Netball courts work hard. Saturday competitions, after-school training and PE classes all land on the same surface, so it has to grip well, drain fast and keep its lines sharp. Most of our netball work is for schools and clubs that need courts to last.
Our crews have built a school multi-sport court on modular tiles with basketball and netball lines, and lined indoor school halls for netball. Here's what goes into a new outdoor court.
How much does it cost to build a netball court?
The cost to build a netball court in Australia depends mostly on the ground you start with, the base, the surface, and whether you add fencing and lighting. We don't publish a single netball price because sites vary so much. Line Marking Australia visits the site and itemises every part of the quote.
| Cost item | What affects it |
|---|---|
| Earthworks and base | Slope, soil type, existing old courts to remove |
| Asphalt or concrete | Court area, number of courts, access for trucks |
| Surface | Acrylic coating, cushioned acrylic, modular tiles or synthetic grass |
| Line marking and posts | Netball only, or extra sports marked as well |
| Fencing and lighting | Height, length, light levels and power supply |
| Resurfacing an existing court | Acrylic recoats start from about $8,000 (Airtasker cost guide, 2026) |
Building several courts side by side usually lowers the cost per court, because site set-up, earthworks and fencing are shared.
What size is a netball court?
A netball court in Australia has a playing area of 30.5 m long by 15.25 m wide, divided into three equal thirds with a goal circle at each end. You also need run-off around the court, and space between courts if you're building a bank of them, so players can move safely beyond the lines.
- Playing area: 30.5 m × 15.25 m
- Thirds: two transverse lines split the court into three equal thirds
- Centre circle and goal circles: marked to the netball rules
- Run-off: clear space around the court and between neighbouring courts
- Goal posts: one at the centre of each goal line, padded for safety
What is the best surface for a netball court?
The best outdoor netball court surface in Australia is usually an acrylic coating on asphalt or concrete, textured for grip, because it is hard-wearing and easy to line. Cushioned acrylic is kinder on knees and ankles. Modular tiles drain quickly and suit schools, and indoor courts are usually timber or synthetic sports floors.
| Surface | Good for | Good to know |
|---|---|---|
| Acrylic on asphalt or concrete | Clubs, councils, schools | Durable, crisp lines; recoat when worn |
| Cushioned acrylic | Clubs wanting more comfort | Extra rubber layers; costs more |
| Modular tiles | Schools, multi-sport courts | Fast to install, drains well, single tiles replaceable |
| Synthetic grass | Multi-use school and club courts | Soft underfoot; needs brushing and infill top-ups |
| Timber or synthetic floor (indoor) | School halls and stadiums | Re-lined when the floor is recoated |
Can a netball court share lines with basketball and other sports?
Yes. A netball court in Australia is often marked with basketball, and sometimes tennis, pickleball or volleyball lines on the same surface. Each sport gets its own colour so players can read their lines easily. Schools and community centres choose this to get more use from one slab.
The trick is to make the lines used most often the clearest, and to avoid placing posts or hoops where they get in the way of another sport. We plan the layout with you before we mark anything. Our multi-sport court construction page shows common combinations.
How long does it take to build a netball court?
A new outdoor netball court usually takes a few weeks on site in Australia, and longer for a bank of courts or a wet, sloping site. Asphalt or concrete needs time to cure before the acrylic coats go on. Resurfacing and re-lining an existing sound court can be much quicker.
- Site visit, layout and council check
- Before You Dig Australia search
- Remove old surface if needed, then excavation, drainage and base
- Asphalt or concrete, then curing time
- Acrylic, tiles or synthetic grass
- Line marking, goal post sleeves and posts
- Fencing and lighting
Do netball courts need lighting and fencing?
Many netball courts in Australia have lighting so clubs can train and play in the evening, and fencing to keep balls in and protect the surface. Lighting is designed for even light across the court with little spill onto neighbours, and fencing height and gates are set to suit the site.
- Lighting: LED floodlights on poles to the AS 2560 series, with spill controlled under AS/NZS 4282
- Fencing: chain-wire or weld-mesh, with gates for players and maintenance
- Extras: shade, seating, scoreboards and accessible paths for spectators
See sports court lighting for more on lighting design.
Are there grants for netball courts?
Yes. Schools, netball clubs and councils in Australia often fund new courts, resurfacing and lighting through state sport infrastructure programs, community benefit funds and council grants. The Queensland Gambling Community Benefit Fund, for example, offers up to $35,000 for club projects such as resurfacing, lighting and fencing.
Other examples include the South Australian Community Facilities Program, which funded $431,000 for Mount Gambier Tennis Club. We can provide quotes and a clear scope of works to support your application.
Do you need council approval for a netball court?
A new netball court may need council approval in Australia, especially with lighting, fences over about 2 m, large earthworks, retaining walls, or a site in a heritage or flood overlay. School and council land have their own approval paths. We check the requirements for your site before the final quote.
How we keep every netball court build compliant
Every netball court we build follows the same compliance steps, from the first council check to the final line. We locate services before digging, manage safety and dust on site, control runoff, and build to the netball court dimensions and the Australian Standards that apply to slabs, access and lighting.
- Council planning and building requirements checked for lighting, fencing, earthworks, drainage and overlays
- Before You Dig Australia (BYDA) check before excavation
- Work Health and Safety laws, with Safe Work Method Statements for excavation and mobile plant
- Silica dust controls when cutting or grinding concrete; sediment and stormwater controls
- Concrete to AS 3600; accessible paths to courts considered against AS 1428.1
- Lighting to AS 2560.1:2018 and AS 2560.2:2021, with spill controlled under AS/NZS 4282
- Slip-resistant textured finishes and courts marked to 30.5 m × 15.25 m
- For schools: work in school holidays where possible, and Working with Children checks for crews
What do you need from me to quote a netball court?
To quote a netball court in Australia we need to know how many courts you want, what's on the ground now and who will use them. Photos, a site plan or rough sketch with measurements, and any grant timelines help us give you a realistic figure, then a site visit firms it up.
- Number of courts, and new build, resurface or conversion
- School, club, council or community site
- What's there now: grass, old asphalt, old courts
- Slope, drainage and access for trucks
- Preferred surface and colours
- Other sports to mark on the same court
- Goal posts, fencing, lighting and power supply
- Approvals in place and any grant deadlines
- Plans or photos, your timing and your budget
Key Benefits
Built for heavy use: durable bases and surfaces for school and club competition
Netball plus more: basketball and other sports marked in contrasting colours
Grant-ready quotes: clear scopes and itemised quotes for funding applications
Lighting and fencing: evening play and ball containment planned from the start
Compliance built in: council checks, BYDA, SWMS, dust and sediment controls

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
Local council approval
Lighting, fencing, earthworks, drainage and overlays checked before the final quote.
Before You Dig Australia
Underground services located before excavation.
WHS Act & SWMS
Safe Work Method Statements for excavation and mobile plant; silica dust and sediment controls.
AS 3600 · AS 1428.1
Concrete to AS 3600; accessible paths to courts considered against AS 1428.1.
AS 2560 · AS/NZS 4282
Court lighting to the AS 2560 series, with light spill controlled under AS/NZS 4282.
Working with Children checks
Crews on school sites hold Working with Children checks; work scheduled for holidays where possible.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS/NZS 2890
Parking Facilities
Covers bay dimensions (2.4m × 5.4m standard, 2.4m × 5.4m accessible plus a 2.4m shared zone), aisle widths, and traffic flow requirements for compliant parking areas.
AS 4586
Slip Resistance
Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.
AS/NZS 1428
Access & Mobility
Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.
What Our Clients Say
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
Netball court costs depend on the ground, the base, the surface, the number of courts and any fencing or lighting, so Line Marking Australia quotes each one per site. Acrylic resurfacing of an existing court starts from about $8,000 (Airtasker cost guide, 2026).
A netball court has a playing area of 30.5 m by 15.25 m, divided into three equal thirds with a centre circle and a goal circle at each end. You also need run-off around the court and space between courts in a bank.
Acrylic on asphalt or concrete, textured for grip, is the most common outdoor netball surface because it is durable and easy to line. Cushioned acrylic is kinder on joints, and modular tiles suit schools. Line Marking Australia builds all three.
Yes. Netball and basketball lines are often marked on the same court in different colours, and other sports can be added. Line Marking Australia plans the layout so the most-used lines are clearest and posts don't get in the way.
Yes. Clubs, schools and councils often use state sport infrastructure programs, community benefit funds and council grants. The Queensland Gambling Community Benefit Fund offers up to $35,000 for club resurfacing, lighting and fencing. Line Marking Australia can supply quotes for applications.
Lighting isn't required, but most clubs add it for evening training and games. Line Marking Australia designs LED court lighting to the AS 2560 series, with spill controlled under AS/NZS 4282, and checks whether your council needs to approve it.
Line Marking Australia schedules school court work in the holidays where possible, keeps the site fenced and safe if work runs into term, and uses crews with Working with Children checks.
Related Services

Court Resurfacing
Learn more about this service

Multi-Sport Court Construction
Learn more about this service

Netball Court Line Marking
Learn more about this service

Sports Court Construction
Learn more about this service

Sports Courts for Schools
Learn more about this service

Sports Courts for Sports Clubs
Learn more about this service
More Sports & Playground Line Marking Services
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call us directly: 0417 460 236
