
Why Geelong Thermoplastic Marking?
Geelong's busy roads and coastal exposure demand durable marking. Thermoplastic lasts 4-8 years compared to 12-24 months for paint.
We provide thermoplastic marking for Geelong roads, carparks, and high-traffic facilities. From the Ring Road to suburban streets, Bellarine Peninsula to Surf Coast, thermoplastic delivers lasting value.
A Geelong council compared paint vs thermoplastic for a busy intersection. Paint needed remarking every 18 months. Thermoplastic lasted 6 years. Over that period, thermoplastic cost less and required fewer traffic disruptions.
Key Benefits
4-8 year typical lifespan in Geelong conditions
Traffic-ready in 10-15 minutes after application
Retroreflective with glass beads for night visibility
Service across Geelong, Bellarine, Surf Coast
VicRoads specification materials
Heat-resistant Grade A thermoplastic

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
AS 4049.4
Australian standard for thermoplastic road marking materials.
VicRoads Section 407
Victorian specification for pavement marking.
AS/NZS 1906.3
Retroreflective materials for road marking.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS/NZS 2890
Parking Facilities
Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.
AS 4586
Slip Resistance
Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.
AS/NZS 1428
Access & Mobility
Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.
What Our Clients Say
4.9/5 from 500+ reviews
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
For busy roads, yes. Calculate total cost over 6-8 years including remarking and traffic management. Thermoplastic usually costs less overall.
Yes, Geelong, Bellarine Peninsula, Surf Coast, Golden Plains, and surrounding areas.
10-15 minutes after application once cooled. Much faster than paint which needs hours to cure.
Yes, high-traffic carpark entries, exits, and main traffic routes benefit from thermoplastic durability.
Related Services

Accessible Parking Line Marking
Professional accessible parking bay marking. AS/NZS 2890.6 compliant disabled bays with correct dimensions, symbols, and shared spaces. Upload plans for quote.

Shopping Centre Pedestrian Crossings
Professional pedestrian crossing marking for shopping centres and carparks. Zebra crossings, raised platforms, and safety marking. AS/NZS 2890.1 compliant.

Safety Zones Line Marking
Professional safety zone line marking for warehouses. Hazard areas, exclusion zones, PPE zones, emergency areas. AS 1319 compliant. Upload plans now.
More Thermoplastic Line Marking Services
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call James directly: 0468 069 002
