
Site Assessment & Quote
Every project starts with understanding exactly what you need. We assess your site, identify compliance requirements, and provide a fixed-price quote you can rely on.
Jamie (24/7 quotes): 0468 069 002AS 1742.2 Compliant
Fully Insured
24/7 Availability
15+ Years
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ businesses
VicRoads approved · AS/NZS compliant · $20M insured
Compliance-Ready Guarantee: every job is marked to AS/NZS 2890 & AS 1742, dimensionally verified, and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.
Last updated:
What is Getting Your Quote Right the First Time?
Quick answer: Line Marking Australia assesses your site, or your uploaded plans, before quoting. We check surface condition, oil contamination, old markings, traffic patterns and access, then send a fixed written quote within 48 hours. Because preparation is assessed up front, the price you approve is the price you pay, with no surprise charges for unforeseen conditions.
A shopping centre manager in Dandenong South once told us about their previous experience. They'd received a quote over the phone, no site visit, no questions about their surface condition or traffic patterns. The final invoice was 40% higher than the quote because of 'unforeseen conditions'. That's not how we work.
We learned early that accurate quotes require proper assessment. Every surface is different. Every facility has unique requirements. A five-minute phone quote might sound convenient, but it usually leads to problems.
We made a quoting mistake early on that taught us this lesson. A warehouse in Somerton asked for 'floor marking'. We quoted based on square metres without visiting. Turned out the floor was heavily contaminated with oil from years of forklift traffic. Our quote didn't include the preparation needed. We honoured the original price and lost money on that job, around $3,200. But we learned. Now we assess properly, quote accurately, and deliver what we promise.
What we check on site
We look at what the surface needs first, such as surface preparation or pressure cleaning and degreasing, and whether old lines need line marking removal. We also confirm the standards that apply, such as AS/NZS 2890.1:2004 for car parks and AS/NZS 2890.6:2009 for accessible bays.

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
AS/NZS 2890.1
We check your plans against off-street parking requirements including bay dimensions and aisle widths.
AS/NZS 2890.6
Accessible parking compliance identified during assessment to avoid council fines.
Safe Work Australia
Warehouse and factory assessments include traffic management requirements.
AS 1742 Series
Road marking assessments reference traffic control device standards.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS/NZS 2890
Parking Facilities
Covers bay dimensions (2.4m × 5.4m standard, 2.4m × 5.4m accessible plus a 2.4m shared zone), aisle widths, and traffic flow requirements for compliant parking areas.
AS 4586
Slip Resistance
Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.
AS/NZS 1428
Access & Mobility
Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.
What Our Clients Say
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
Yes, site assessments are free and no-obligation. We visit, assess, and provide a quote. You're under no pressure to proceed.
Within 48 hours of receiving your plans or completing a site visit. Often faster for straightforward projects.
No. Quotes are free. We only charge when you accept a quote and we complete the work.
For simple projects with good plans, yes. For complex projects or where surface condition is uncertain, we recommend a site visit.
Quotes are valid for 30 days. After that, we may need to reassess if material costs have changed.
We quote fixed prices, not estimates. If we find unexpected issues during work, we discuss options with you before proceeding. No surprise invoices.
Related Services

Airport Line Marking Sydney
Learn more about this service

Shopping Centre Pedestrian Crossings
Learn more about this service

Time Limited & Permit Bays
Learn more about this service
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call us directly: 0417 460 236
