Line marking service hero background

Multi-Sport Courts for Caravan and Holiday Parks

One hard-wearing court for basketball, pickleball, tennis and more, built for guests of every age. Compact half courts from about $10,000.

Jamie (24/7 quotes): 0468 069 002

AS 1742.2 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ businesses

VicRoads approved · AS/NZS compliant · $20M insured

Compliance-Ready Guarantee: every job is marked to AS/NZS 2890 & AS 1742, dimensionally verified, and delivered with full compliance documentation, backed by our 12-month workmanship guarantee.

Court details (helps us quote accurately)

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

Last updated:

What is Multi-Sport Courts for Caravan and Holiday Parks?

Line Marking Australia builds multi-sport courts for caravan and holiday parks across Australia, combining basketball, pickleball, tennis, futsal and other games on one hard-wearing surface. A compact half court starts from about $10,000 including the slab (published Australian builder pricing, 2026), and larger park courts are quoted per site.

Families choose holiday parks for the things kids can do. A good court keeps them busy for hours and gives parents a reason to book again next school holidays.

A multi-sport court is the best value because one slab serves many games. Here's what park owners and managers ask us before they build.

Why do caravan parks add multi-sport courts?

Caravan and holiday parks add multi-sport courts because one court entertains guests of every age with very little staff time. Kids shoot hoops, families play pickleball and teenagers kick a futsal ball, all on the same surface. A court also photographs well for booking sites and helps parks compete for school-holiday family bookings.

  • Free activity that keeps kids busy and parents relaxed
  • Several sports on one slab, so no single group takes over
  • Low running costs and simple equipment
  • A visible feature for listings and social media

Which sports can share a holiday park court?

A holiday park multi-sport court commonly combines basketball, pickleball, netball, futsal, volleyball, badminton and tennis, with each sport's lines in a different colour. Basketball and pickleball are the most popular pairing for parks because they suit all ages and fit a modest slab. We recommend a primary sport so the lines stay readable.

SportPlaying areaSuits parks because
Basketball (full court)28 m × 15 m (FIBA)Most-used by kids and teens; a half court suits smaller sites
Pickleball13.41 m × 6.10 mEasy for families and older guests
Tennis (doubles)23.77 m × 10.97 mClassic guest favourite where space allows
Volleyball18 m × 9 mGood for groups with a portable net
Badminton (doubles)13.4 m × 6.1 mLight, social play on calm days
FutsalCommon sizes we build to suit the slabKick-around games with small goals

How much does a caravan park multi-sport court cost?

A caravan park multi-sport court starts from about $10,000 for a compact half court of up to about 165 m² including the slab, and a full-size basketball court of about 420 m² starts from about $70,000 (both published Australian builder pricing, 2026). Fencing, lighting, shade and extra equipment are quoted per site.

Site preparation, slope, drainage and access for concrete trucks move the price most. We itemise each item so you can build the court now and add lights or fencing in a later season.

What surface is best for a holiday park court?

The best holiday park court surface is usually textured acrylic on a concrete slab, because it's tough, grippy and easy to re-line for new sports. Modular sports tiles are a strong alternative: they drain quickly, install fast and can be lifted and repaired in sections. Lighter colours stay cooler in summer sun.

  • Acrylic on concrete: long-lasting, true bounce, easy to clean
  • Modular tiles: quick install, good drainage, replaceable panels
  • Cushioned acrylic: softer underfoot, more cost

We've built school multi-sport courts on modular tiles with basketball hoops, and the same approach suits busy holiday parks.

Where should a caravan park put its court?

A caravan park court works best near the playground, camp kitchen or pool, where parents can keep an eye on kids, but away from powered sites and cabins where a bouncing ball keeps people awake. Clear sight lines from reception help staff supervise. A north–south layout keeps the low sun out of players' eyes.

  • Away from cabins, quiet zones and van sites
  • Fencing to keep balls out of roads and gardens
  • Shade and seating for parents watching
  • Step-free path from the main park roads

Do caravan parks need council approval for a court?

A caravan park court may need council approval in Australia, depending on the earthworks, fencing over about 2 m, lighting, drainage and any flood, coastal or heritage overlays. Many parks sit in flood-prone or coastal areas, so overlays are common. We check your council's requirements before the final quote and provide drawings if needed.

Should a park court have lighting?

Lighting lets holiday park guests play in the cooler evenings, which is when many families are free in summer. Court lights are designed to the AS 2560 sports lighting standards, with spill kept off cabins and van sites under AS/NZS 4282. Timers or push-button switches with auto-off stop lights running late into quiet hours.

How do you build without disrupting guests?

We build caravan park courts around guests by working outside peak school-holiday periods where possible, fencing and signing the work zone, routing concrete trucks away from park roads used by children, and agreeing work hours with management. Noisy work stays in the middle of the day. One contact handles the job from start to finish.

  1. Site visit, layout and season planning
  2. Approvals and Before You Dig Australia check
  3. Earthworks, drainage and slab, or tile base
  4. Surface, multi-sport lines, hoops and posts
  5. Fencing, lighting and shade, then handover

How we keep every holiday park court build compliant

Every caravan park multi-sport court we build is planned against council rules, safety laws and the right Australian Standards. That means approvals checked early, services located before digging, safe work methods around guests, concrete to AS 3600, accessible paths considered against AS 1428.1, and lighting that keeps spill off cabins.

  • Each sport's court dimensions, with lines in contrasting colours
  • Local council planning or building approval checked, including flood and coastal overlays
  • Before You Dig Australia check before excavation
  • Concrete slabs to AS 3600 with drainage falls
  • Accessible paths considered against AS 1428.1
  • Sports lighting to AS 2560.1:2018 and AS 2560.2:2021, spill limited under AS/NZS 4282
  • Safe Work Method Statements, silica dust controls and sediment controls
  • Slip-resistant textured finishes; builders licensed for your state with public liability insurance

See our multi-sport court construction page for court builds in detail, our sports courts for caravan parks page for other park facilities, and our sports court tiles page if you prefer a modular surface.

What do you need from us to quote a caravan park court?

To quote a caravan park multi-sport court, Line Marking Australia needs to know where it will go, how big you'd like it, which sports you want marked and what's on the ground now. Photos, a site plan, your quiet-season dates and any lighting, fencing or shade plans help us return an accurate, itemised quote.

  • Proposed location and available space
  • Sports to mark, and the main sport
  • What's there now, slope and drainage
  • Access for concrete trucks and machinery
  • Surface preference: acrylic or modular tiles
  • Hoops, nets, goals, fencing, lighting and shade
  • Known overlays or approvals
  • Plans, photos, preferred build season and budget

Key Benefits

Many sports, one slab: basketball, pickleball, futsal and more

From about $10,000: compact half courts, with extras itemised

Tough surfaces: acrylic or modular tiles for heavy use

Guest-friendly works: built outside peak holidays where possible

Lights and fencing: added now or in a later season

Fenced blue multi-sport court with a basketball hoop beside cabins, palm trees and a putting green at a beachside holiday park
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

Sport court dimensions

Each sport marked to its playing area in contrasting colours.

Local council approval

Earthworks, fencing, lighting and flood or coastal overlays checked.

AS 3600 · BYDA

Slabs to AS 3600; Before You Dig Australia check before excavation.

AS 1428.1

Step-free paths to the court considered against AS 1428.1.

AS 2560 · AS/NZS 4282

Evening lighting with spill kept off cabins and van sites.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 2.4m × 5.4m accessible plus a 2.4m shared zone), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

“650-bay shopping centre carpark remarked over two weekend nights. Centre stayed open, customers didn't notice. Parking complaints dropped 80% in first month according to security logs. Best investment this year.”

Laverton North, VIC

Shopping Centre Manager

“Full warehouse floor marking before safety audit. Assessed Thursday, quoted Friday, completed Sunday night. 2,400 linear metres in one eight-hour shift. Audit passed with zero recommendations. That's the turnaround you need.”

Campbellfield, VIC

Logistics Operations Manager

“Entire playground remarked during Easter holidays. Basketball courts, netball courts, handball squares, running track. Kids came back to completely fresh markings. Five days, zero disruption to term. Exactly what we needed.”

Keysborough, VIC

School Business Manager

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0417 460 236

Jamie (24/7 quotes): 0468 069 002

Frequently Asked Questions

A compact half court starts from about $10,000 including the slab, and a full-size basketball court from about $70,000 (published Australian builder pricing, 2026). Line Marking Australia quotes fencing, lighting and shade separately for each park.

Basketball and pickleball are the most popular pairing, with netball, futsal, volleyball, badminton and tennis also possible. Line Marking Australia marks each sport in a contrasting colour and recommends a main sport so lines stay readable.

Textured acrylic on concrete is tough, grippy and easy to re-line. Modular sports tiles drain quickly and install fast. Line Marking Australia recommends lighter colours so the holiday park court stays cooler in summer.

Near the playground, pool or camp kitchen so parents can watch, but away from cabins and van sites because of ball noise. Line Marking Australia also plans fencing, shade, seating and a step-free path.

It may, depending on earthworks, tall fencing, lighting, drainage and flood or coastal overlays, which are common at parks. Line Marking Australia checks your council's requirements before the final quote and supplies drawings.

Yes. Line Marking Australia designs court lighting to AS 2560, keeps spill off cabins and van sites under AS/NZS 4282, and fits timers or push-button switches so lights don't run into quiet hours.

Related Services

Basketball Court Construction

Basketball Court Construction

Learn more about this service

View details
Multi-Sport Court Construction

Multi-Sport Court Construction

Learn more about this service

View details
Multi-Sport Court Line Marking

Multi-Sport Court Line Marking

Learn more about this service

View details
Sports Court Tiles

Sports Court Tiles

Learn more about this service

View details
Sports Courts for Caravan Parks

Sports Courts for Caravan Parks

Learn more about this service

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0417 460 236