
Why Thomastown Warehouse Floor Marking?
A manufacturing facility in Thomastown contacted us about a complete floor marking redesign. They had installed new production equipment that changed material flow through the building. The original floor marking from ten years earlier no longer matched how they actually operated.
We assessed the facility during a Wednesday site visit. The scope included removing all existing marking, planning new layouts matching current processes, and applying fresh marking throughout. Work was scheduled for their annual shutdown weekend. Three days from start to finish.
When production resumed, the floor marking finally matched how they worked. Forklift lanes aligned with actual traffic patterns. Pedestrian paths avoided conflict points. Storage zones reflected current inventory systems. The operations manager said it was like working in a new facility.
Thomastown is established northern industrial territory. Mature facilities have often been operating for decades. Original floor marking from initial construction rarely suits how operations have evolved. Layout redesign brings marking into alignment with current reality.
Layout redesign starts with understanding how you actually operate. We observe traffic patterns, note conflict points, and identify where current marking creates confusion rather than clarity. The new layout is planned to support operations as they exist today.
Old marking removal is often essential for layout redesign. Previous lines may conflict with new traffic patterns. Ghost lines from removed marking confuse operators. We strip existing paint mechanically before applying new layouts, eliminating any confusion from previous schemes.
Forklift safety remains the foundation regardless of layout changes. Yellow lanes define new vehicle travel paths. White pedestrian walkways keep workers separate. Intersection treatments manage new crossing points. The colours and concepts remain standard even when positions change.
Storage zone marking adapts to current inventory systems. Manufacturing facilities in Thomastown often have evolved their storage arrangements over years. Fresh floor marking can reflect current zone allocations rather than outdated arrangements.
Shutdown scheduling suits facilities that cannot pause during normal operations. Annual shutdowns, Christmas closures, and planned maintenance periods provide windows for complete floor marking projects. We coordinate with your schedule to maximise these opportunities.
Surface conditions in established Thomastown facilities vary significantly. Some floors are in good condition. Others have years of wear, oil contamination, or previous coating failures. We assess each facility and recommend appropriate preparation.
Emergency escape routes need updating alongside operational marking. Fire exits, assembly points, and emergency equipment locations may need repositioning in redesigned layouts. We include emergency marking in every scope to ensure continued compliance.
Compliance documentation for layout redesigns includes before and after photographs, new layout diagrams, and material specifications. This documentation demonstrates the transition and provides reference for future planning.
Established facilities sometimes need partial redesign rather than complete renovation. New equipment in one area may require localised changes while other zones remain unchanged. We scope projects to address actual requirements.
Our Thomastown coverage extends throughout the established northern industrial corridor including Epping, Preston, and Reservoir. Crews familiar with these areas understand the typical requirements of mature manufacturing and warehousing facilities.
For warehouse floor marking in Thomastown, whether complete redesign or targeted updates, upload your plans or contact Niel directly. We can assess your current layout and recommend approaches that match your operational needs.
Key Benefits
Layout redesign specialists
Line removal included
Shutdown scheduling available
WorkSafe Victoria compliant
Established facility experience
Before and after documentation

Site Inspection
Free assessment and detailed quote
Professional Marking
Expert application with premium materials
Quality Assurance
Final inspection and compliance sign-off
Compliance Standards
AS 4586
Slip resistance classification for pedestrian surfaces.
AS/NZS 1428.1
Design for access and mobility requirements.
Safe Work Australia
Workplace traffic management guidelines.
WorkSafe Victoria
Victorian workplace safety requirements.
AS 1318
Industrial safety colour coding standards.
AS 4049
Road marking paint materials and durability.
Fully Compliant & Certified
All our work meets or exceeds Australian Standards and state road authority requirements
VicRoads Approved
Registered Contractor
$20M Public Liability
$10M Professional Indemnity
5,000+ Projects
Since 2009
Fixed Prices
Not Estimates
AS 1742
Traffic Control Devices
Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.
AS/NZS 2890
Parking Facilities
Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.
AS 4586
Slip Resistance
Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.
AS/NZS 1428
Access & Mobility
Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.
What Our Clients Say
4.9/5 from 500+ reviews
Results based on typical project outcomes. Individual results may vary.
Upload your site plans for a detailed quote within 48 hours
Get an accurate, fixed-price quote tailored to your specific project requirements
Frequently Asked Questions
Yes. We assess how you actually operate, identify where current marking creates confusion, and plan new layouts supporting current processes. Complete redesign brings floor marking into alignment with operational reality.
Where existing marking conflicts with new layouts, we remove it mechanically. This prevents ghost lines that confuse operators. Removal is included in our scope where needed for clear, unambiguous new layouts.
Yes. Shutdown periods provide ideal windows for complete floor marking projects. We coordinate with your schedule to maximise these opportunities. Weekend and holiday periods are commonly used for major works.
New equipment often changes traffic patterns and requires localised floor marking updates. We can address specific areas affected by equipment changes while leaving other zones unchanged. Scope matches actual requirements.
Yes. We supply before and after photographs plus new layout diagrams. This documentation demonstrates the transition, provides reference for future planning, and supports compliance requirements.
Yes. Our coverage extends throughout the northern industrial corridor including Epping, Preston, Reservoir, and surrounding suburbs. Crews are familiar with the typical requirements of established manufacturing facilities.
Related Services

Warehouse Line Marking Epping
Professional warehouse line marking in Epping. Forklift lanes, safety zones, pedestrian paths. WorkSafe compliant. Free quotes.

Warehouse Line Marking Tullamarine
Professional warehouse line marking in Tullamarine. Forklift lanes, safety zones, pedestrian paths. WorkSafe compliant. Free quotes.

Carpark Line Marking Tullamarine
Professional carpark line marking in Tullamarine. Industrial, logistics, commercial facilities. AS/NZS 2890 compliant. Free quotes.
More Warehouse Line Marking Services
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call James directly: 0468 069 002
